[1]张 婷,周 慧,赖金星,等.西安地铁双线平行盾构隧道净距优化[J].筑路机械与施工机械化,2017,(10):78-83.
 ZHANG Ting,ZHOU Hui,LAI Jin-xing,et al.Optimization of Clearance of Tunnel in Xi'an Metro Constructed with Double Shield TBM[J].,2017,(10):78-83.
点击复制

西安地铁双线平行盾构隧道净距优化()
分享到:

《筑路机械与施工机械化》[ISSN:1000-033X/CN:61-1119/U]

卷:
期数:
2017年10期
页码:
78-83
栏目:
设计与实验
出版日期:
2017-10-15

文章信息/Info

Title:
Optimization of Clearance of Tunnel in Xi'an Metro Constructed with Double Shield TBM
文章编号:
1000-033X(2017)10-0078-06
作者:
张 婷1周 慧2赖金星2汪 珂3冯志华2
1.广州市轻工技师学院 现代制造产业系,广东 广州 510220;
2.长安大学 公路学院,陕西 西安 710064;
3.中铁第一勘察设计院集团有限公司,陕西 西安 710043
Author(s):
ZHANG Ting1 ZHOU Hui 2 LAI Jin-xing2 WANG Ke3 FENG Zhi-hua2
1.Department of Modern Manufacturing Industry, Guangzhou Technician College of Light Industry,Guangzhou 510220, Guangdong, China;
2.School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China;
3.China Railway First Survey and Design Institute Group Co., Ltd., Xi'an 710043, Shaanxi, China
关键词:
地铁 隧道净距 沉降 盾构
Keywords:
metro clearance of tunnel settlement shield
分类号:
U455.43
文献标志码:
B
摘要:
为了探究双线平行盾构下穿古建筑时的合理净距取值,依托西安地铁4号线区间双线盾构下穿和平门城墙及护城河工程,通过建立三维弹塑性模型,对双线隧道在不同净距工况下地表沉降、围岩塑性应变及管片变形等规律进行分析。结果表明:双线盾构机械施工通过后,右线隧道轴线的地表沉降值大于左线隧道轴线地表沉降值; 随着净距的增加,沉降槽宽度逐渐加宽,而地表沉降最大值有明显减小; 管片位移整体受净距影响较小。研究成果可为黄土地区双线地铁隧道的净距优化提供理论参考。
Abstract:
In order to explore the reasonable clearance of the double-line tunnel constructed with double shield TBM beneath the ancient buildings, the three-dimensional elastoplastic model was established based on the the construction of the section of Xi'an No.4 Metro covering the brick walls around Peace Arch and the moat.The analysis of the surface settlement, the plastic strain of the surrounding rocks and the deformation of the segment were carried out under working conditions with different clearance.The results show that after the construction with double shield TBM, the value of surface settlement at the axis of the right line is bigger than that of the left line; with the increase of the clearance, the width of the settlement channel gradually widens, and the maximum value of surface settlement is significantly reduced; the overall displacement of the segment is less affected by the clearance.The research results can provide a theoretical reference for the optimization of the clearance of the double-line subway tunnel in the loess area.

参考文献/References:

[1] 魏 纲,庞思远.双线平行盾构隧道施工引起的三维土体变形研究[J].岩土力学,2014(9):2562-2568.
[2] 王 伟,夏才初,朱合华,范明星.双线盾构越江隧道合理间距优化与分析[J].岩石力学与工程学报,2006,25(S1):3311-3316.
[3] 孔庆凯,刘化图.新建隧道穿越施工对既有双线地铁隧道的影响[J].地下空间与工程学报,2010,6(S1):1448-1451.
[4] 刘树佳,张孟喜,吴惠明,等.新建盾构隧道上穿对既有隧道的变形影响分析[J].岩土力学,2013,34(S1):399-405.
[5] 杜晓伟,高永涛.软土地区大直径盾构对邻近桩基础建筑物影响研究[J].中国安全生产科学技术,2014(12):131-137.
[6] 刘 俊.盾构隧道施工对邻近桩基的形变影响研究[D].西南交通大学,2013.
[7] 汪 珂.西安地铁隧道盾构下穿和平门区段方案优化分析[D].西安:长安大学,2016.
[8] 任建喜,张引合,冯超.地铁隧道盾构施工引起的古城墙变形规律及其控制技术[J].岩土力学,2011(S1):445-450.
[9] 李 宁,顾强康,朱才辉,等.西安地铁二号线下穿古城墙段地表沉降控制标准研究[J].岩石力学与工程学报,2009,28(S2):3753-3761.
[10] 雷永生.西安地铁二号线下穿城墙及钟楼保护措施研究[J].岩土力学,2010,31(1):223-236.
[11] 朱才辉,李 宁.西安地铁施工诱发地表沉降及对城墙的影响[J].岩土力学,2011(S1):538-544.
[12] 冯 超,王 喆,潘娜娜.地铁隧道施工过古城墙的地表变形及控制措施[J].现代隧道技术,2011,48(5):143-147.

备注/Memo

备注/Memo:
收稿日期:2017-03-17
基金项目:陕西省科技厅社会发展科技攻关项目(2016SF-412)
作者简介:张 婷(1974-),女,河南焦作人,高级讲师,从事机械制造方面的教学与科研工作。
更新日期/Last Update: 2017-10-30